Awards

Contingency Response Wing Mobile Power Generation Prototype

2018-08-13T14:00:21-07:00

CLOSED ! ! !

Request for Solutions: Contingency Response Wing Mobile Power Generation Prototype

1.0 Purpose

This Request for Solutions is seeking a demonstrable Mobile Power Generation system which is 1) lighter; 2) presents a reduced footprint; 3) utilizes a variable output (30KvM and 60 KvM); and 4) more ►

Contingency Response Wing Mobile Power Generation Prototype2018-08-13T14:00:21-07:00

Unmanned Aerial System (UAS) Instrumentation Device

2018-07-31T00:01:42-07:00

 

 

FOR IMMEDIATE RELEASE

U.S. Army Awards Contract to Develop Prototype Sensors
For Drones Used in Training Exercises
Agreement Seeks to Operationalize Army’s
LTE Networks in California and Louisiana

(Arlington, VA – July XX, 2018) The National Security Technology Accelerator (NSTXL) and the Training and Readiness Accelerator (TReX) today announced the U.S. Army ►

Unmanned Aerial System (UAS) Instrumentation Device2018-07-31T00:01:42-07:00

Naval Operational Business Logistics Enterprise (NOBLE)

2018-07-16T00:01:42-07:00

CLOSED ! ! !

Request for Solutions:

Naval Operational Business Logistics Enterprise (NOBLE) Prototype(s)

Naval Operational Supply System (NOSS), Naval Aviation Maintenance System (NAMS), Naval Operational Maintenance Environment (NOME), Integrated Data Environment (IDE)

 Submitted Questions and Responses: NOBLE_Question_Master_List_Final

FIAR Guidance: FIAR_Guidance – 2017

NOBLE RFS Amendment: RFS – NOBLE – Final – 9Aug Amd1

9 August 2018

 1.0      ►

Naval Operational Business Logistics Enterprise (NOBLE)2018-07-16T00:01:42-07:00

Procedural Generation of Underground Environments

2018-05-28T13:11:03-07:00

 

COMING SOON

Procedural Generation of Underground Environments

June 19, 2018 Note: This effort was previously planned to be released in June 2018, but funding for this effort has been diverted to another project for FY18. This effort is still planned to be executed under TReX in early-mid FY19.

The Army desires more realistic underground virtual environments ►

Procedural Generation of Underground Environments2018-05-28T13:11:03-07:00

Persistent Cyber Training Environment (PCTE) Cyber Innovation Challenge #4

2018-04-16T14:21:54-07:00

Persistent Cyber Training Environment (PCTE) Cyber Innovation Challenge #4

***

September 7, 2018 Update: The prototype project for PCTE CIC #4 is no longer estimated to be released during 2018 and the PCTE program is taking a strategic pause to reassess the capabilities developed through CIC’s 1 through 3 to determine future requirements.

***

CIC 4: ►

Persistent Cyber Training Environment (PCTE) Cyber Innovation Challenge #42018-04-16T14:21:54-07:00

Joint Standard Instrumentation Suite Missile Attitude Subsystem (JMAS)

2018-02-15T01:00:31-08:00

 

AWARDED ! ! !

Request for Solutions: Joint Standard Instrumentation Suite Missile Attitude Subsystem (JMAS)

1.0 Purpose

This Request for Solutions (RFS) is issued to locate capable vendors with the ability to deliver a unique solution for the Joint Standard Instrumentation Suite Missile Attitude Subsystem (JMAS) requirement presented below. The Government ►

Joint Standard Instrumentation Suite Missile Attitude Subsystem (JMAS)2018-02-15T01:00:31-08:00

System of Systems Controlled Environment Test Infrastructure (SCETI)

2018-01-24T18:00:14-08:00

 

 

AWARDED ! ! !

[Word Doc version of Technical Supplement uploaded 3/8 for ease of response in red-lining submissions. Note: red-lined RFS Technical Supplement does not count towards page count]

Request for Solutions: System-of-Systems Controlled Environment Test Infrastructure

1.0 Purpose

This Request for Solutions (RFS) is issued to locate capable vendors with the ability to ►

System of Systems Controlled Environment Test Infrastructure (SCETI)2018-01-24T18:00:14-08:00
Go to Top